Department of Defense, through Department of the Air Force, awarded Mainstream Engineering Corp of Rockledge, FL $1,799,218 under the SBIR program, with work starting 2025-07-23 and running to 2027-07-23. It is one of 9 SBIR and STTR awards Mainstream Engineering Corp received in the last two years, $4,533,608 in all. Each figure links to the federal record.
The award
| Recipient | Mainstream Engineering Corp (Rockledge, FL) |
|---|---|
| Awarding agency | Department of Defense |
| Awarding office | Department of the Air Force |
| Amount obligated | $1,799,218 |
| Period of performance starts | 2025-07-23 |
| Period of performance ends | 2027-07-23 |
| Award number | FA237725CB021 (contract) |
| Industry (NAICS) | 541715, Research and development in the physical, engineering, and life sciences (except nanotechnology and biotechnology) |
| Product or service code | AC12, National defense R&D services; department of defense - military; applied research |
| Place of performance | Rockledge, Brevard County, FL |
| Recipient registry id (UEI) | YR8FJBGXWRR1 |
Want the whole picture on Mainstream Engineering Corp?
Example from a real report (our sample on Target): “The Q2 2026 earnings report, published August 19, 2026, showed adjusted EPS of $2.46 against an expected $2.33” Source: CNBC
A Full Report on Mainstream Engineering Corp: verified, sourced, every claim cited, ready in a few minutes. See pricing.
What the Full Report on Mainstream Engineering Corp covers
The Short Answer
Which Company This Is
What They Do, And How The Money Works
Who Runs It, And How To Reach Them
The Money: Funding, Valuation, Runway
Who Pays Them, And Who They Are Up Against
Warning Bells
Sources
9 cited sources found
Plus the sections for what you are deciding, which you pick after ordering.
A real finished report, first screen. Opens in a new tab.
What it is for
Ii proposal f2-18506-scalable and fast epitaxy of high quality, single crystal znse substrates
Funding actions on this award
| Date | Action | Modification | Amount |
|---|---|---|---|
| 2026-06-10 | Supplemental agreement for work within scope | P00001 | $0 |
| 2025-07-23 | Initial award | 0 | $1,799,218 |
From the federal award record.
Other SBIR and STTR awards to Mainstream Engineering Corp
| Starts | Agency | Program | Amount | Project |
|---|---|---|---|---|
| 2026-06-25 | Department of Defense | SBIR | $139,774 | N254-P02 new award ph i mainstream engineering corporation systems, inc. NAVSEA (record) |
| 2026-04-01 | Department of Defense | SBIR | $249,986 | Ph i topic A254-016 for innovative operations for treatment and processing of wastewater (record) |
| 2026-03-31 | Department of Defense | SBIR | $1,499,363 | Atmospheric water generation on the move (awg-otm) (record) |
| 2025-09-29 | National Aeronautics and Space Administration | SBIR | $149,725 | I magnetic bearings for cryogenic fluid management (record) |
| 2025-07-28 | Department of Defense | SBIR Phase I | $249,976 | Small business innovation research (SBIR) Phase I, topic A244-071: Water at the point of n (record) |
| 2025-03-01 | Department of Defense | SBIR Phase I | $249,986 | Small business innovative research (SBIR) Phase I topic A244-066, mainstream engineering c (record) |
| 2025-02-07 | Department of Defense | SBIR Phase I | $95,580 | In-situ epitaxial defect reduction with augmented instrumentation and intelligent control (record) |
| 2024-12-16 | Environmental Protection Agency | SBIR Phase I | $100,000 | EPA SBIR FY25 Phase I point-of-use water treatment module for trace harmful species (record) |
Who runs it, who owns it, where the money comes from and what to watch for, every claim linked to its source.
Order Full Report on Mainstream Engineering CorpLook up Mainstream Engineering Corp and see what is on record before you decide.
Get the free SnapshotWhere this comes from
The Small Business Innovation Research (SBIR) and Small Business Technology Transfer (STTR) programs set aside part of federal research budgets for small companies. Agencies award them in phases: Phase I tests whether an idea is feasible, Phase II funds development, and Phase III is follow-on work paid for outside the set-aside. STTR awards also require a research institution as a partner.
Every figure on this page is taken from the award's own federal record, linked beside it, as it stood when the page was built: the recipient, its address, the awarding agency and office, the amount obligated so far, the dates and the description. Phase and program are shown as the award's own description states them. The amount can grow later if the agency adds funding to the same award.
