National Aeronautics and Space Administration awarded M4 Engineering, Inc. of Long Beach, CA $849,987 under the SBIR program (Phase II), with work starting 2025-07-10 and running to 2027-07-09. It is one of 3 SBIR and STTR awards M4 Engineering, Inc. received in the last two years, $1,224,967 in all. Each figure links to the federal record.
The award
| Recipient | M4 Engineering, Inc. (Long Beach, CA) |
|---|---|
| Awarding agency | National Aeronautics and Space Administration |
| Phase | Phase II |
| Amount obligated | $849,987 |
| Period of performance starts | 2025-07-10 |
| Period of performance ends | 2027-07-09 |
| Award number | 80NSSC25C0005 (contract) |
| Industry (NAICS) | 541713, Research and development in nanotechnology |
| Product or service code | AJ14, General science and technology R&D services; general science and technology; R&D administrative expenses |
| Place of performance | Long Beach, Los Angeles County, CA |
| Recipient registry id (UEI) | DM3EW67JLQM1 |
Want the whole picture on M4 Engineering, Inc.?
Example from a real report (our sample on Target): “In March 2026, Target announced a planned incremental $1 billion operating investment” Source: Target Corporation (press release)
A Full Report on M4 Engineering, Inc.: verified, sourced, every claim cited, ready in a few minutes. See pricing.
What the Full Report on M4 Engineering, Inc. covers
The Short Answer
Which Company This Is
What They Do, And How The Money Works
Who Runs It, And How To Reach Them
The Money: Funding, Valuation, Runway
Who Pays Them, And Who They Are Up Against
Warning Bells
Sources
27 cited sources found
Plus the sections for what you are deciding, which you pick after ordering.
A real finished report, first screen. Opens in a new tab.
What it is for
80nssc25c0005 uam design space exploration framework with embedded version control
Funding actions on this award
| Date | Action | Modification | Amount |
|---|---|---|---|
| 2026-06-23 | Other administrative action | P00004 | $0 |
| 2026-01-20 | Other administrative action | P00003 | $0 |
| 2025-12-10 | Other administrative action | P00002 | $0 |
| 2025-11-18 | Other administrative action | P00001 | $0 |
| 2025-07-10 | Initial award | 0 | $849,987 |
From the federal award record.
Other SBIR and STTR awards to M4 Engineering, Inc.
| Starts | Agency | Program | Amount | Project |
|---|---|---|---|---|
| 2026-09-30 | National Aeronautics and Space Administration | SBIR Phase I | $224,989 | Agentic framework for precision composite optomechanical hardware (record) |
| 2025-09-29 | National Aeronautics and Space Administration | SBIR | $149,991 | I PYFOIL81: Rotorcraft design tool airfoil table generator (record) |
Every other federal award to M4 Engineering, Inc. on record
The federal register lists 24 other awards to the same registry id (UEI DM3EW67JLQM1), $25,442,837 in all, from 2 agencies.
| Starts | Agency | Amount | Award |
|---|---|---|---|
| 2025-09-29 | Department of the Air Force | $1,863,980 | A as landing gear engineering services analysis (FA820325C0022) |
| 2024-03-07 | Missile Defense Agency | $1,493,773 | STTR Phase II R&D (HQ086024C7611) |
| 2024-01-29 | National Aeronautics and Space Administration | $849,994 | STTR Phase II topology optimization for design of highly tailored composites for afp manufacturing (80NSSC24CA025) |
| 2023-08-08 | Department of the Navy | $1,299,956 | Research and development (N6833523C0317) |
| 2022-08-22 | Department of the Army | $1,096,364 | Basic research & development dha Phase II SBIR 21.1 project titled, underwater blast lung computational model (W81XWH22C0080) |
| 2022-05-06 | Department of the Air Force | $1,249,994 | Physics-based structural analysis model development and integration with computational aircraft prototype synt (FA864922P0973) |
| 2021-07-08 | National Aeronautics and Space Administration | $749,935 | OT aeroelasticity and aeroservoelastic control (80NSSC21C0518) |
| 2020-09-25 | National Aeronautics and Space Administration | $1,124,962 | Generative adversarial networks for real-time realistic physics simulations (80NSSC20C0210) |
| 2019-12-20 | National Aeronautics and Space Administration | $1,124,333 | Novel ase scaled model design, fabrication, and testing (80NSSC20C0019) |
| 2019-05-02 | Department of the Navy | $999,883 | Research and development (N6833519C0117) |
| 2018-05-31 | Department of the Air Force | $1,249,284 | Air force rapid innovation fund - advanced analytics to support weapons certification for 5TH/6TH generation p (FA248718C0024) |
| 2016-09-26 | National Aeronautics and Space Administration | $749,955 | We propose the development of a novel aerodynamic modeling approach making use of fully unstructured grids for (NNX16CD28C) |
| 2016-07-20 | Department of the Navy | $1,399,604 | Research and development, igf::OT::igf (N6833516C0176) |
| 2015-05-27 | National Aeronautics and Space Administration | $749,816 | In aircraft design, reducing structural weight is often a prime objective, while various constraints in multip (NNX15CD08C) |
| 2015-05-15 | National Aeronautics and Space Administration | $749,941 | Approaches for weight prediction, in the conceptual design phase, typically consist of parametric relations or (NNX15CL25C) |
| 2014-09-12 | Department of the Air Force | $1,542,884 | Evaluation of unsteady loading on store trajectories SBIR ii (FA865014C2527) |
| 2014-03-10 | Department of the Navy | $749,711 | STTR N12A-T004 (N6833514C0100) |
| 2012-12-11 | Department of the Air Force | $949,918 | AF112-187 wind tunnel balance correction for structual steel motion effects (FA910113C0003) |
| 2012-06-29 | Department of the Air Force | $869,921 | SBIR P2 topic AF093-214 store unsteady aerodynamic loads measurement technology (FA910112C0021) |
| 2011-02-09 | Department of the Navy | $749,691 | Topic N101-015 virtual vibration of external stores (N6893611C0016) |
| 2007-11-08 | National Aeronautics and Space Administration | $1,211,032 | The supersonics project is aligned with the armd principals of maintaining intellectual stewardship of aeronau (NNL08AA00C) |
| 2007-03-20 | Department of the Air Force | $910,786 | Geometry manipulation through automated parameterization (FA865007C3714) |
| 2005-06-08 | Department of the Air Force | $849,931 | 200509!002370!5700!FA8650!det 1 AFRL/pk !fa865005c3537 !a!n! !n! ! !200506 (FA865005C3537) |
| 2004-12-22 | Defense Contract Management Agency | $857,188 | 200503!000508!2100!W31P4Q!USA aviation and missile command!w31p4q05cr035 !a!n! !n! ! !200412 (W31P4Q05CR035) |
Who runs it, who owns it, where the money comes from and what to watch for, every claim linked to its source.
Order Full Report on M4 Engineering, Inc.Look up M4 Engineering, Inc. and see what is on record before you decide.
Get the free SnapshotWhere this comes from
The Small Business Innovation Research (SBIR) and Small Business Technology Transfer (STTR) programs set aside part of federal research budgets for small companies. Agencies award them in phases: Phase I tests whether an idea is feasible, Phase II funds development, and Phase III is follow-on work paid for outside the set-aside. STTR awards also require a research institution as a partner.
Every figure on this page is taken from the award's own federal record, linked beside it, as it stood when the page was built: the recipient, its address, the awarding agency and office, the amount obligated so far, the dates and the description. Phase and program are shown as the award's own description states them. The amount can grow later if the agency adds funding to the same award.
