Department of Defense, through Missile Defense Agency, awarded Lunar Resources, Inc. of Houston, TX $1,964,997 under the SBIR program (Phase II), with work starting 2025-09-30 and running to 2027-09-29. It is one of 2 SBIR and STTR awards Lunar Resources, Inc. received in the last two years, $2,814,996 in all. Each figure links to the federal record.
The award
| Recipient | Lunar Resources, Inc. (Houston, TX) |
|---|---|
| Awarding agency | Department of Defense |
| Awarding office | Missile Defense Agency |
| Phase | Phase II |
| Amount obligated | $1,964,997 |
| Period of performance starts | 2025-09-30 |
| Period of performance ends | 2027-09-29 |
| Award number | HQ086025CE044 (contract) |
| Industry (NAICS) | 541715, Research and development in the physical, engineering, and life sciences (except nanotechnology and biotechnology) |
| Product or service code | AC13, National defense R&D services; department of defense - military; experimental development |
| Place of performance | Houston, Harris County, TX |
| Signed | 2025-09-29 |
| Recipient registry id (UEI) | G3ZMPB72ELP8 |
| Parent company in the record | Lunar Resources Inc |
Want the whole picture on Lunar Resources, Inc.?
Example from a real report (our sample on Target): “The Q2 2026 earnings report, published August 19, 2026, showed adjusted EPS of $2.46 against an expected $2.33” Source: CNBC
A Full Report on Lunar Resources, Inc.: verified, sourced, every claim cited, ready in a few minutes. See pricing.
What the Full Report on Lunar Resources, Inc. covers
The Short Answer
Which Company This Is
What They Do, And How The Money Works
Who Runs It, And How To Reach Them
The Money: Funding, Valuation, Runway
Who Pays Them, And Who They Are Up Against
Warning Bells
Sources
31 cited sources found
Plus the sections for what you are deciding, which you pick after ordering.
A real finished report, first screen. Opens in a new tab.
What it is for
Direct to Phase II: Helix high-power pulsed electromagnetic microwave power supply (hemps)
Funding actions on this award
| Date | Action | Modification | Amount |
|---|---|---|---|
| 2025-09-29 | Initial award | 0 | $1,964,997 |
From the federal award record.
Other SBIR and STTR awards to Lunar Resources, Inc.
| Starts | Agency | Program | Amount | Project |
|---|---|---|---|---|
| 2025-08-11 | National Aeronautics and Space Administration | SBIR Phase II | $849,999 | 80nssc25c0086 immortal molten regolith electrolysis anode for oxygen and metals extraction (record) |
Every other federal award to Lunar Resources, Inc. on record
The federal register lists 29 or more other awards to the same registry id (UEI G3ZMPB72ELP8), $15,652,144 in all, from 3 agencies.
| Starts | Agency | Amount | Award |
|---|---|---|---|
| 2025-10-01 | Department of the Army | $999,999 | Sundown project for development of the helix hpm autocannon (hac) (W911NF25CA032) |
| 2025-07-30 | Department of the Army | $2,000,000 | Direct to Phase II topic A244-072, lighter, low-cost family of bidirectional inverters (W5170125CA162) |
| 2024-09-25 | National Aeronautics and Space Administration | $889,999 | Phase II-ignite - silicon and iron extraction on the moon (80NSSC24CA216) |
| 2024-08-07 | National Aeronautics and Space Administration | $150,000 | FY24 SBIR Phase I- lunar joining of elementary structures (lujes) (80NSSC24PB359) |
| 2024-08-07 | National Aeronautics and Space Administration | $149,999 | FY24 SBIR Phase I- immortal molten regolith electrolysis anode for oxygen and metals extraction from lunar reg (80NSSC24PB358) |
| 2024-07-22 | Department of the Army | $1,899,999 | SBIR Phase II (W911NF24C0074) |
| 2024-02-21 | National Aeronautics and Space Administration | $149,999 | SBIR Phase I - ignite silicon and iron regolith extraction on the moon (sire) (80NSSC24PA316) |
| 2024-01-29 | Department of the Army | $249,943 | SBIR Phase I project (W911NF24P0011) |
| 2023-12-08 | Department of the Air Force | $75,000 | SBIR Phase I proposal fx237-pcso1-1268 - defeat of unmanned aircraft systems via pulse power systems at scale (FA864924P0353) |
| 2023-08-03 | National Aeronautics and Space Administration | $149,999 | P1 -processing and extraction of metal oxide slag on the moon (80NSSC23PC117) |
| 2023-08-03 | National Aeronautics and Space Administration | $149,999 | SBIR Phase I: In-situ casting of standard structural elements on the moon (icse) (80NSSC23PB475) |
| 2023-07-21 | Department of the Air Force | $1,500,000 | Removal, recycling and reconstitution of orbital debris enabled by welding in space (FA864923P1225) |
| 2023-06-30 | National Aeronautics and Space Administration | $849,999 | FY23 SBIR Phase II - ultra-electrical-efficient process to perform regolith additive manufacturing of complex (80NSSC23CA113) |
| 2023-06-01 | National Aeronautics and Space Administration | $599,723 | Farview observatory a large in situ manufactured lunar far side radio array (80NSSC23K0965) |
| 2023-03-01 | National Aeronautics and Space Administration | $174,732 | 22-niac23b-0076 lunar south pole oxygen pipeline (80NSSC23K0587) |
| 2022-08-19 | Department of the Air Force | $250,000 | In-space joining and welding of metallic materials for satellite servicing applications (FA864922P1215) |
| 2022-07-25 | National Aeronautics and Space Administration | $149,990 | EO14042 SBIR Phase I ultra-electrical-efficient process to perform regolith additive manufacturing of complex (80NSSC22PB077) |
| 2022-01-01 | National Science Foundation | $1,000,000 | SBIR Phase II: Protoflight design and validation of molten regolith electrolysis facility for lunar in-situ re (2112076) |
| 2021-11-04 | National Aeronautics and Space Administration | $1,251,519 | EO14042 molten regolith electrolysis reactor definition and process control. (80NSSC22C0001) |
| 2021-08-13 | National Aeronautics and Space Administration | $749,999 | Prototype development of a molten regolith electrolysis oxygen capturing, filtering and storage system (80NSSC21C0523) |
| 2021-08-06 | Department of the Air Force | $750,000 | Novel additive manufacturing of high-temperature refractory alloys for hypersonic and aircraft applications (FA864921P1604) |
| 2021-06-01 | National Aeronautics and Space Administration | $124,999 | We propose to perform an end-to-end system-level study of how to build a very large low frequency (5-40 mhz) r (80NSSC21K0693) |
| 2021-02-05 | Department of the Air Force | $50,000 | Fx20c-tcs01-0073 in-space manufacturing and servicing of high emissivity coatings for satellite servicing and (FA864921P0604) |
| 2020-11-18 | Department of the Air Force | $150,000 | Pulse power based additive manufacturing of functional aircraft parts from refractory and ceramic materials. (FA864921P0111) |
| 2020-09-09 | National Aeronautics and Space Administration | $10,000 | Molten regolith electrolysis: The extraction of oxygen from lunar regolith (80NSSC20K1701) |
| 2020-08-31 | National Aeronautics and Space Administration | $124,997 | Molten regolith electrolysis: The extraction of oxygen from lunar regolith (80NSSC20C0350) |
| 2020-08-31 | National Aeronautics and Space Administration | $124,951 | Molten regolith electrolysis: The extraction of oxygen from lunar regolith (80NSSC20C0337) |
| 2020-06-01 | National Science Foundation | $225,000 | SBIR Phase I: Protoflight design and validation of molten regolith electrolysis facility for lunar in-situ res (2001310) |
| 2019-11-06 | Department of the Air Force | $701,299 | Brass-board in-space chemical vapor deposition system and dielectric optical coatings on large substrates (FA880820C0009) |
Who runs it, who owns it, where the money comes from and what to watch for, every claim linked to its source.
Order Full Report on Lunar Resources, Inc.Look up Lunar Resources, Inc. and see what is on record before you decide.
Get the free SnapshotWhere this comes from
The Small Business Innovation Research (SBIR) and Small Business Technology Transfer (STTR) programs set aside part of federal research budgets for small companies. Agencies award them in phases: Phase I tests whether an idea is feasible, Phase II funds development, and Phase III is follow-on work paid for outside the set-aside. STTR awards also require a research institution as a partner.
Every figure on this page is taken from the award's own federal record, linked beside it, as it stood when the page was built: the recipient, its address, the awarding agency and office, the amount obligated so far, the dates and the description. Phase and program are shown as the award's own description states them. The amount can grow later if the agency adds funding to the same award.
