Department of Defense, through Department of the Air Force, awarded Martin Brothers Construction of Sacramento, CA a prime contract with $16,438,115 obligated so far, with work starting 2025-09-30 and running to 2026-11-24. The record puts its value with all options at $28,929,812. Each figure links to the federal record.
The contract
| Recipient | Martin Brothers Construction (Sacramento, CA) |
|---|---|
| Awarding agency | Department of Defense |
| Awarding office | Department of the Air Force |
| Amount obligated | $16,438,115 |
| Value with all options | $28,929,812 |
| Period of performance starts | 2025-09-30 |
| Period of performance ends | 2026-11-24 |
| Industry (NAICS) | 237310, Highway, street, and bridge construction |
| Product or service code | Z2BD, Repair or alteration of airport runways and taxiways |
| Place of performance | Travis Afb, Solano County, CA |
| How it was competed | Full and open competition after exclusion of sources |
| Set-aside | Small business set aside - total |
| Offers received | 3 |
| Contract type | Definitive contract |
| Award number | FA890325C0028 |
| Recipient registry id (UEI) | YUS3LBSE3WB6 |
| Business categories | Hispanic American Owned Business, Minority Owned Business, Self-Certified Small Disadvantaged Business, Small Business, Subchapter S Corporation |
Want the whole picture on Martin Brothers Construction?
Example from a real report (our sample on Target): “In March 2026, Target announced a planned incremental $1 billion operating investment” Source: Target Corporation (press release)
A Full Report on Martin Brothers Construction: verified, sourced, every claim cited, ready in a few minutes. See pricing.
What the Full Report on Martin Brothers Construction covers
The Short Answer
Which Company This Is
What They Do, And How The Money Works
Who Runs It, And How To Reach Them
The Money: Funding, Valuation, Runway
Who Pays Them, And Who They Are Up Against
Warning Bells
Sources
25 cited sources found
Plus the sections for what you are deciding, which you pick after ordering.
A real finished report, first screen. Opens in a new tab.
What it is for
Travis afb design-bid-build project to demo and replace 29K sy of concrete, drainage, and pcc transitions. Includes an on-site batch plant.
From the federal award record.
Funding actions on this contract
| Date | Action | Modification | Amount |
|---|---|---|---|
| 2025-09-30 | Initial award | 0 | $16,438,115 |
Every other federal award to Martin Brothers Construction on record
The federal register lists 24 other awards to the same registry id, $292,063,653 in all, from 4 agencies.
| Starts | Agency | Amount | Award |
|---|---|---|---|
| 2026-04-08 | Forest Service | $3,256,107 | This contract is critical to repair the roads damaged during the atmospheric river events that affected the ta (12363N26F4063) |
| 2024-09-30 | Department of the Army | $5,250,527 | Pavement 10+91.5 to 30+02.21 (W9123824C0027) |
| 2023-12-21 | Federal Highway Administration | $21,933,392 | Ca flap ed CR147(2) ICE house road award a contract for construction/rehabilitation of 17.62 miles of roadway. (6982AF24C000005) |
| 2023-07-11 | Forest Service | $4,531,564 | Creek (15) - con - roads, creek fire beasore road repairs (12363N23C4014) |
| 2023-04-10 | Federal Highway Administration | $6,120,913 | Construction of ca np yose 500(7) valley-wide continuous flow intxn (6982AF23C000025) |
| 2023-01-10 | Forest Service | $2,689,205 | Creek (15) - con - scenic byway creek fire road repairs phase 1. (12970223C0006) |
| 2021-09-30 | National Park Service | $23,596,991 | Yose 229677 - rehabilitate the tuolumne meadows campground to enhance visitor experience (140P2021C0083) |
| 2018-09-19 | Department of the Army | $17,333,415 | Igf: OT::igf rinquist road (roadwork) (W9123818F0138) |
| 2018-09-04 | Department of the Army | $4,883,645 | Flood repair of levees (W9123818C0030) |
| 2018-01-31 | Department of the Army | $3,637,238 | ; mission/silo road Phase II&iv (W911SA18C2005) |
| 2017-09-29 | Department of the Army | $3,770,837 | Levee reconstruction at feather river sites under PL84-99 (W9123817C0043) |
| 2017-09-29 | Department of the Air Force | $2,286,706 | Repair remaining joint sealant runway 15 (FA468617F0030) |
| 2017-09-26 | Department of the Army | $19,968,462 | Motco paving project anderson, pch, christenbury (W9123817F0043) |
| 2017-04-24 | Department of the Army | $2,603,000 | Base - barstow, ca mep (W912QR17C0014) |
| 2016-09-29 | Federal Highway Administration | $30,231,392 | Ca flap SR89(1) truckee river bridge dtfh6816c00034 igf::CT::igf 4R reconstruction 3 new roundabouts 2 new br (DTFH6816C00034) |
| 2016-08-03 | Department of the Army | $11,997,407 | 400 parking ramp, travis air force base (W9123816C0022) |
| 2016-06-20 | National Park Service | $22,692,796 | X:other mariposa grove restoration phase 5 construction at yosemite national park, yosemite, mariposa county, (INP16PC00256) |
| 2015-11-12 | Department of the Navy | $1,992,207 | PE15309M repair sewer mains and manholes, basewide, mcb camp pendleton, ca (0002) |
| 2015-06-29 | National Park Service | $4,220,230 | Restoration of the mariposa grove within yosemite national park. This project is the fourth phase of a five-ph (INP15PC00247) |
| 2013-09-30 | Department of the Army | $3,419,190 | Runway pavement rehabilitation (0001) |
| 2012-03-14 | Federal Highway Administration | $3,106,053 | HFPM-11-0267; ca pfh 190-1(1) fish hatchery road; roadway rehabilitation, asphalt overlay, and drainage improv (DTFH6812C00011) |
| 2011-09-29 | Department of the Navy | $2,541,662 | Base clin for joc (0003) |
| 2011-01-27 | Federal Highway Administration | $9,097,775 | Construction contract - aggregate surfacing (DTFH6811C00006) |
| 2009-04-08 | Bureau of Reclamation | $80,902,941 | Phasae ii of the folsom dam spillway safety of dams modification (INR10PC20747) |
Who runs it, who owns it, where the money comes from and what to watch for, every claim linked to its source.
Order Full Report on Martin Brothers ConstructionLook up Martin Brothers Construction first. Finding the company and seeing how much is on record uses no credits.
Look up Martin Brothers ConstructionWhere this comes from
Federal agencies report every prime contract they sign to the government's register of federal awards: the recipient and its address, the awarding agency and office, the amount obligated, the dates, the industry and product or service codes, where the work is done and how the contract was competed. Contracts to small businesses are marked as such in the same record.
Every figure on this page is taken from the contract's own federal record, linked beside it, as it stood when the page was built. The amount obligated can grow later if the agency adds funding or exercises options on the same contract; the value with all options, where shown, is the most the record says it could reach.
