Department of Transportation, through Federal Highway Administration, awarded Bryant'S Land And Development Industries, Inc. of Burnsville, NC a prime contract with $17,007,296 obligated so far, with work starting 2026-01-06 and running to 2027-03-30. Each figure links to the federal record.
The contract
| Recipient | Bryant'S Land And Development Industries, Inc. (Burnsville, NC) |
|---|---|
| Awarding agency | Department of Transportation |
| Awarding office | Federal Highway Administration |
| Amount obligated | $17,007,296 |
| Period of performance starts | 2026-01-06 |
| Period of performance ends | 2027-03-30 |
| Industry (NAICS) | 237310, Highway, street, and bridge construction |
| Product or service code | Y1LB, Construction of highways, roads, streets, bridges, and railways |
| Place of performance | Spruce Pine, Mitchell County, NC |
| How it was competed | Full and open competition after exclusion of sources |
| Contract type | Delivery order |
| Placed under | 693C7320D000014 (IDC) |
| Award number | 693C7326F00015N |
| Recipient registry id (UEI) | Y4ZPM3CNMSQ6 |
| Business categories | HUBZone Firm, Self-Certified Small Disadvantaged Business, Small Business, Subchapter S Corporation |
Want the whole picture on Bryant'S Land And Development Industries, Inc.?
Example from a real report (our sample on Target): “In March 2026, Target announced a planned incremental $1 billion operating investment” Source: Target Corporation (press release)
A Full Report on Bryant'S Land And Development Industries, Inc.: verified, sourced, every claim cited, ready in a few minutes. See pricing.
What the Full Report on Bryant'S Land And Development Industries, Inc. covers
The Short Answer
Which Company This Is
What They Do, And How The Money Works
Who Runs It, And How To Reach Them
The Money: Funding, Valuation, Runway
Who Pays Them, And Who They Are Up Against
Warning Bells
Sources
25 cited sources found
Plus the sections for what you are deciding, which you pick after ordering.
A real finished report, first screen. Opens in a new tab.
What it is for
Project nc np blri 2K13; nc np blri 2K14 the project consists of hurricane damage repairs at mp 316.4, 325.8 and 325.9. The work includes bridge rail replacement concrete repair, riprap placement, pavement reconstruction, pavement markings, culver
From the federal award record.
Funding actions on this contract
| Date | Action | Modification | Amount |
|---|---|---|---|
| 2026-07-09 | Funding only action | P00005 | $4,298,320 |
| 2026-05-14 | Funding only action | P00004 | $1,069,040 |
| 2026-05-07 | Funding only action | P00003 | $954,100 |
| 2026-03-16 | Funding only action | P00002 | $498,800 |
| 2026-01-07 | Other administrative action | P00001 | $0 |
| 2026-01-06 | Initial award | 0 | $10,187,036 |
Every other federal award to Bryant'S Land And Development Industries, Inc. on record
The federal register lists 24 other awards to the same registry id, $126,272,607 in all, from 3 agencies.
| Starts | Agency | Amount | Award |
|---|---|---|---|
| 2026-09-21 | National Park Service | $3,771,519 | BLRI-354977 blue ridge parkway hazardous (140P2026F0224) |
| 2026-03-10 | Forest Service | $2,821,082 | The proposed work includes emergency hazardous debris removal on federal lands to manage immediate threats to (12363N26F4048) |
| 2025-07-01 | Federal Highway Administration | $2,378,922 | Nc erfo np blri 2024-1(9) the project consists of roadway excavation, embankment construction, culvert replac (693C7325F00088N) |
| 2025-05-08 | Federal Highway Administration | $4,631,666 | Project nc np grsm 10S(1): The project consists of placing a thin lift asphalt concrete pavement overlay on ne (693C7325F00068N) |
| 2024-10-31 | Federal Highway Administration | $6,072,761 | Project tn np grsm 21(1): The project consists of asphalt concrete paving of cosby government quarters and ran (693C7325C000004) |
| 2023-05-25 | Federal Highway Administration | $29,698,622 | Project np-grsm 10N(3), 19(1), 107(1): Schedule a - lakeview drive east (swain county, nc). Work includes per (693C7323C000010) |
| 2023-01-03 | Federal Highway Administration | $3,634,892 | Project np-blri pvt pres fy 22(1): The project consists of thin lift asphalt overlay of roadways, overlooks, (693C7323C000003) |
| 2022-08-23 | Federal Highway Administration | $9,821,057 | Project np-grsm 11(4): The work in schedule a includes the replacement of the tunnel drainage system and chas (693C7322C000020) |
| 2022-04-26 | Federal Highway Administration | $2,299,847 | Project VA erfo nps blri 2020-1(2): The project consists of slide repair at mp 119.7 and mp 127.9. The work (693C7322C000012) |
| 2022-01-13 | Federal Highway Administration | $2,549,083 | Project np-grsm 17(1): The project consists of resurfacing clingmans dome access road, including parking areas (693C7322F000016) |
| 2021-06-30 | Federal Highway Administration | $4,263,207 | Project np-foot pms(2) the project consists of pavement preservation treatment (asphalt concrete pavement and (693C7321C000018) |
| 2020-12-15 | Federal Highway Administration | $7,907,593 | Np-grsm (10N(1) and 10N(2) the project consists of rehabilitating approximately 2.44 miles of newfound gap roa (693C7321C000004) |
| 2020-12-11 | Federal Highway Administration | $2,300,212 | Project np-blri 2J17 the project includes installing a drainage system, replacement of asphalt concrete paveme (693C7321C000003) |
| 2020-05-28 | Federal Highway Administration | $7,290,604 | Project np biso 10(2): The project consists of the resurfacing of approximately 7.6 miles of the leatherwood f (693C7320C000018) |
| 2019-03-13 | Federal Highway Administration | $7,726,441 | Project np ser pms FY18(1) the project consists of pavement preservation treatment in cape hatteras national s (693C7319C000008) |
| 2018-08-30 | Federal Highway Administration | $2,591,048 | Project: Np-nace 17(2), 18(2), 19(2), 118(1), 206(1) the project consists of the rehabilitation and resurfaci (693C7318C000051) |
| 2018-07-03 | Federal Highway Administration | $3,415,568 | Project: Np-blri 1E10 the project consists of the rehabilitation and resurfacing of approximately 10.25 miles (693C7318C000046) |
| 2018-02-16 | Federal Highway Administration | $2,317,955 | Project no. Np - grsm 15(2), 16(1) the project consists of the rehabilitation and resurfacing of approximately (693C7318C000033) |
| 2018-02-09 | Federal Highway Administration | $2,109,127 | Blri 2H14 (693C7318C000032) |
| 2017-05-10 | Federal Highway Administration | $4,413,170 | Project: Ftnp-blri 2A15 the project consists of the rehabilitation and resurfacing of approximately 12 miles (DTFH7117C00019) |
| 2016-08-03 | Federal Highway Administration | $2,215,760 | Project: Fw-chn 10(1) the project consists of the rehabilitation and resurfacing of approximately 2.65 miles (DTFH7116C00031) |
| 2013-12-19 | Federal Highway Administration | $3,446,682 | Project: Blri 2P18 the project consists of the restoration and stabilization of the slide area on the blue ri (DTFH7114C00005) |
| 2013-05-02 | Federal Highway Administration | $4,999,720 | Schedule a: Participation in design of the project located near milepost 242 of the blue ridge parkway in alle (DTFH7113C00032) |
| 2010-04-08 | Federal Highway Administration | $3,596,069 | The project consists of the restoration and stabilization of the blue ridge parkway slide area at mp 400.8 wit (DTFH7110C00018) |
Who runs it, who owns it, where the money comes from and what to watch for, every claim linked to its source.
Order Full Report on Bryant'S Land And Development Industries, Inc.Look up Bryant'S Land And Development Industries, Inc. first. Finding the company and seeing how much is on record uses no credits.
Look up Bryant'S Land And Development Industries, Inc.Where this comes from
Federal agencies report every prime contract they sign to the government's register of federal awards: the recipient and its address, the awarding agency and office, the amount obligated, the dates, the industry and product or service codes, where the work is done and how the contract was competed. Contracts to small businesses are marked as such in the same record.
Every figure on this page is taken from the contract's own federal record, linked beside it, as it stood when the page was built. The amount obligated can grow later if the agency adds funding or exercises options on the same contract; the value with all options, where shown, is the most the record says it could reach.