MentionFox
Home › Grants › Elementum 3d, Inc.
Federal R&D award · STTR Phase II

Elementum 3d, Inc. STTR Phase II award

Award N0002425CT036, starting 2025-05-13. Every figure below is from the federal award record.

Department of Defense, through Department of the Navy, awarded Elementum 3d, Inc. of Erie, CO $1,207,355 under the STTR program (Phase II), with work starting 2025-05-13 and running to 2027-05-01. It is one of 2 SBIR and STTR awards Elementum 3d, Inc. received in the last two years, $1,357,350 in all. Each figure links to the federal record.

The award

RecipientElementum 3d, Inc. (Erie, CO)
Awarding agencyDepartment of Defense
Awarding officeDepartment of the Navy
PhasePhase II
Amount obligated$1,207,355
Period of performance starts2025-05-13
Period of performance ends2027-05-01
Award numberN0002425CT036 (contract)
Industry (NAICS)541713, Research and development in nanotechnology
Product or service codeAC32, National defense R&D services; defense-related activities; applied research
Place of performanceErie, Weld County, CO
Value with all options$1,699,824
Recipient registry id (UEI)HJ5TSFNC65K3

Want the whole picture on Elementum 3d, Inc.?

Example from a real report (our sample on Target): “In March 2026, Target announced a planned incremental $1 billion operating investment” Source: Target Corporation (press release)

A Full Report on Elementum 3d, Inc.: verified, sourced, every claim cited, ready in a few minutes. See pricing.

What the Full Report on Elementum 3d, Inc. covers

  1. The Short Answer

  2. Which Company This Is

  3. What They Do, And How The Money Works

  4. Who Runs It, And How To Reach Them

  5. The Money: Funding, Valuation, Runway

  6. Who Pays Them, And Who They Are Up Against

  7. Warning Bells

  8. Sources

    27 cited sources found

Plus the sections for what you are deciding, which you pick after ordering.

See a sample report

First screen of a real sample Full Report on Target: the verdict, 16 sections, 39 cited sources, dated 2026-09-28A real finished report, first screen. Opens in a new tab.

What it is for

Base award for STTR Phase II topic #N22A-T015

Funding actions on this award

DateActionModificationAmount
2025-05-13Initial award0$1,207,355

From the federal award record.

Other SBIR and STTR awards to Elementum 3d, Inc.

StartsAgencyProgramAmountProject
2025-09-29National Aeronautics and Space AdministrationSTTR Phase I$149,995GRX-810 for cold spray additive manufacturing coating and repair (record)

Every other federal award to Elementum 3d, Inc. on record

The federal register lists 25 or more other awards to the same registry id (UEI HJ5TSFNC65K3), $10,535,674 in all, from 4 agencies.

StartsAgencyAmountAward
2026-06-30National Aeronautics and Space Administration$211,266Development builds for low overhang turbine blades with minimal dross and supports (80NSSC26P0837)
2025-07-28National Aeronautics and Space Administration$75,764E3D IN625 RAM2 powder for hls risk reduction testing (80NSSC25PB547)
2025-05-02National Aeronautics and Space Administration$75,764600KGS of IN625 RAM2 additive manufacturing powder (80NSSC25PB001)
2025-03-28National Aeronautics and Space Administration$25,151Provide 1000 lbs. Of coated metal powder (80NSSC25PA814)
2025-01-30National Aeronautics and Space Administration$82,100NASA alloy GRX-810 powder (80NSSC25PA487)
2025-01-29National Aeronautics and Space Administration$114,625NASA alloy GRX-810 powder (80NSSC25PA456)
2025-01-18Department of the Air Force$74,994Permeate: Permeability enabled by rapid manufacturing for enhanced aerospace technology effectiveness (FA864925P0101)
2023-09-28Department of the Army$1,899,992High-strength aluminum advanced manufacturing of missiles for enhanced readiness (haammer) - Phase II (W911NF23C0058)
2023-09-22Department of the Navy$178,228Printing and machining (N6893623P0483)
2023-04-10Department of the Army$25,862High strength aluminum additive manufacturing powder for the material science & engineering division technolog (W31P4Q23P0012)
2022-08-16Department of the Navy$1,999,769Progress report #1 (N6833522C0443)
2022-07-18Department of the Army$172,785Phase I STTR (W56HZV22C0024)
2022-07-13Department of the Navy$239,644STTR Phase I. (N6833522C0485)
2022-04-01Departmental Offices$1,243,426Phase II SBIR - development of additive manufacturing and post-processing methods for fabrication of rhenium p (140D0422C0003)
2022-01-18National Aeronautics and Space Administration$51,340Cif permiam GRCOP-42 and inconel 718 chamber and injector hardware (80NSSC22PA084)
2021-06-07Department of the Navy$239,703Research and development (N6833521C0429)
2021-05-19National Aeronautics and Space Administration$124,992Existing magnetic materials and manufacturing methods are inadequate for producing large-diameter hall-effect (80NSSC21C0174)
2021-02-04Department of the Air Force$49,666Fx203-cso1-2310 additive manufactured high specific stiffness metal matrix composites for beryllium alloy repl (FA864921P0534)
2020-09-29Department of the Navy$117,280Composite case (N6893620P0631)
2019-11-21Department of the Army$999,983Option period 1 - STTR Phase II - (W911NF20C0012)
2019-08-26National Aeronautics and Space Administration$753,752Additive manufacturing of advanced GRCOP42 material (80NSSC19C0613)
2018-12-18Defense Contract Management Agency$149,995Phase I first monthly technical report (W911NF19P0020)
2018-09-14National Aeronautics and Space Administration$11,500Hi-tech aluminum (80NSSC18P3556)
2018-03-01National Science Foundation$1,393,092SBIR Phase II: Reactive additive manufacturing of advanced superalloys for turbine engines (1758865)
2016-12-01National Science Foundation$225,000SBIR Phase I: Reactive additive manufacturing (1647373)
Want the whole picture on Elementum 3d, Inc.?

Who runs it, who owns it, where the money comes from and what to watch for, every claim linked to its source.

Order Full Report on Elementum 3d, Inc.
Not ready to order?

Look up Elementum 3d, Inc. and see what is on record before you decide.

Get the free Snapshot

Where this comes from

The Small Business Innovation Research (SBIR) and Small Business Technology Transfer (STTR) programs set aside part of federal research budgets for small companies. Agencies award them in phases: Phase I tests whether an idea is feasible, Phase II funds development, and Phase III is follow-on work paid for outside the set-aside. STTR awards also require a research institution as a partner.

Every figure on this page is taken from the award's own federal record, linked beside it, as it stood when the page was built: the recipient, its address, the awarding agency and office, the amount obligated so far, the dates and the description. Phase and program are shown as the award's own description states them. The amount can grow later if the agency adds funding to the same award.

Cite this page

Permanent URL: https://mentionfox.com/grants/elementum-3d-n0002425ct036
Last updated 2026-09-30
Primary record: Federal award record
Elementum 3d, Inc.: $1,207,355 STTR Phase II award from the Department of Defense (2025). MentionFox, 2026-09-30. https://mentionfox.com/grants/elementum-3d-n0002425ct036