MentionFox
Home › Grants › Big Metal Additive LLC
Federal R&D award · SBIR Phase II

Big Metal Additive LLC SBIR Phase II award

Award N0002425CS077, starting 2025-09-17. Every figure below is from the federal award record.

Department of Defense, through Department of the Navy, awarded Big Metal Additive LLC of Denver, CO $1,963,423 under the SBIR program (Phase II), with work starting 2025-09-17 and running to 2027-09-17. It is one of 3 SBIR and STTR awards Big Metal Additive LLC received in the last two years, $3,160,277 in all. Each figure links to the federal record.

The award

RecipientBig Metal Additive LLC (Denver, CO)
Awarding agencyDepartment of Defense
Awarding officeDepartment of the Navy
PhasePhase II
Amount obligated$1,963,423
Period of performance starts2025-09-17
Period of performance ends2027-09-17
Award numberN0002425CS077 (contract)
Industry (NAICS)541713, Research and development in nanotechnology
Product or service codeAC32, National defense R&D services; defense-related activities; applied research
Place of performanceDenver, Denver County, CO
Recipient registry id (UEI)KQALHC62NA83

Want the whole picture on Big Metal Additive LLC?

Example from a real report (our sample on Target): “In March 2026, Target announced a planned incremental $1 billion operating investment” Source: Target Corporation (press release)

A Full Report on Big Metal Additive LLC: verified, sourced, every claim cited, ready in a few minutes. See pricing.

What the Full Report on Big Metal Additive LLC covers

  1. The Short Answer

  2. Which Company This Is

  3. What They Do, And How The Money Works

  4. Who Runs It, And How To Reach Them

  5. The Money: Funding, Valuation, Runway

  6. Who Pays Them, And Who They Are Up Against

  7. Warning Bells

  8. Sources

    15 cited sources found

Plus the sections for what you are deciding, which you pick after ordering.

See a sample report

First screen of a real sample Full Report on Target: the verdict, 16 sections, 39 cited sources, dated 2026-09-28A real finished report, first screen. Opens in a new tab.

What it is for

Base award SBIR Phase II topic N204-A03

Funding actions on this award

DateActionModificationAmount
2026-06-15Other administrative actionP00002$0
2026-02-12Other administrative actionP00001$0
2025-09-17Initial award0$1,963,423

From the federal award record.

Other SBIR and STTR awards to Big Metal Additive LLC

StartsAgencyProgramAmountProject
2026-04-10Department of DefenseSBIR Phase II$1,096,929Baa 25.d, DLA topic 25D-003, SBIR Phase II aluminum-scandium aerospace structures (record)
2025-07-21Department of DefenseSTTR Phase I$99,925Topic DLA25D-003 big metal additive, llc proposes to demonstrate quality assessments with (record)

Every other federal award to Big Metal Additive LLC on record

The federal register lists 12 other awards to the same registry id (UEI KQALHC62NA83), $5,615,076 in all, from 3 agencies.

StartsAgencyAmountAward
2025-06-05U.S. Coast Guard$55,169Housing seal (70Z08025P21252B00)
2023-12-14Department of the Air Force$109,980Fracture and fatigue of 2XXX and 7XXX aluminum alloys produced with wire arc-directed energy deposition (FA864924P0277)
2023-03-09Department of the Army$78,6971 connector arm and 2 sector gears using waam for erdc gsl. U438240 (W912HZ23F0076)
2023-02-13Department of the Air Force$1,699,214Mission optimized service spacecraft (FA864923P0577)
2022-11-04Department of the Air Force$74,954Proposal fx224-ocso1-1210, title: Unitized monolithic rotating detonation engine, topic number: X224-OCSO1 (FA864923P0204)
2022-08-01National Aeronautics and Space AdministrationOptimized isogrid structures using hybrid additive manufacturing (80NSSC22M0245)
2022-03-11Department of the Air Force$749,973Optimized additive manufactured aircraft structure (FA864922P0786)
2021-04-05Department of the Navy$1,748,117Research and development (N6833521C0314)
2021-03-08Department of the Air Force$749,350Ham-sat hybrid additive manufactured satellite (FA864921P0929)
2021-02-05Department of the Air Force$49,963Hybrid additive manufacturing process to use additive metal and machining to produce finished components with (FA864921P0724)
2021-01-25Department of the Air Force$149,774Optimized additive manufactured aircraft structure (FA864921P0034)
2020-07-13Department of the Navy$149,885Research and development (N6833520C0732)
Want the whole picture on Big Metal Additive LLC?

Who runs it, who owns it, where the money comes from and what to watch for, every claim linked to its source.

Order Full Report on Big Metal Additive LLC
Not ready to order?

Look up Big Metal Additive LLC and see what is on record before you decide.

Get the free Snapshot

Where this comes from

The Small Business Innovation Research (SBIR) and Small Business Technology Transfer (STTR) programs set aside part of federal research budgets for small companies. Agencies award them in phases: Phase I tests whether an idea is feasible, Phase II funds development, and Phase III is follow-on work paid for outside the set-aside. STTR awards also require a research institution as a partner.

Every figure on this page is taken from the award's own federal record, linked beside it, as it stood when the page was built: the recipient, its address, the awarding agency and office, the amount obligated so far, the dates and the description. Phase and program are shown as the award's own description states them. The amount can grow later if the agency adds funding to the same award.

Cite this page

Permanent URL: https://mentionfox.com/grants/big-metal-additive-n0002425cs077
Last updated 2026-09-30
Primary record: Federal award record
Big Metal Additive LLC: $1,963,423 SBIR Phase II award from the Department of Defense (2025). MentionFox, 2026-09-30. https://mentionfox.com/grants/big-metal-additive-n0002425cs077